Grouped procurement proposals for 1983
Documents from 28 January 1983 to 30 November 1983Identity Statement
96
Microfiche, Paper
Casar, Andreja
Content and Structure
Official issues : proposals concerning study of comparison of space segments, replacement of building control system, operational support to launch and Early Orbit Phase (LEOP) from Italian TT/C station at Malindi, maintenance and operation of European Space Tribology Laboratory (ESTL), contract staff for strucural analysis, computer installations at ESOC, ESTEC, ESRIN, studies on ARIANE-4 APEX interfaces, services for launch of ARIANE-4, electrical maintenance at ESOC, modification of Weilheim ground station to meet GIOTTO requirements, system configuration studies for orbital propulsion moduel, operation of Maspalomas Nimbus-7 station in 1983-1985, provision of operations engineering services in ESOC, review of implications and usefulness of spacecraft servicing in Low-Earth Orbit (LEO), evaluation of European Geostationary Apogee Motor (MAGE) solid rocket motor plume heating and contamination, extension of METEOSAT ground computer system, operation of new Administrative Systems on IBM European Service Bureau, participation in sounding rocket flight opportunity for microgravity research, advanced Synthetic Aperture Radar (SAR), antenna technology at 20/30 GHz, prototype for accurate reflectors for compact test range, studies for launcher technology identification, assessment of potential of solid propulsion for future launchers, rocket engines, space station system,
meintenance of METEOSAT ground computer system, packaging of high capacity NiCd cells, ESTEC schoolbus service, modular attitude and control system and propulsion control and drive electronics, with test and simulation, optimised approach to damage tolerance, NASVAT system evaluation study, multi-user facility on-board Spacelab for human physiology research, information dissemination by satellite, additional equipment for emergency no-break power supply systems, service contract for software, design, production and documentation, transponder test equipment, mission model programme for future launchers, mathematical model for future launcher cost estimates, study of adaptation of European Retrievable Carrier (EURECA) concept to non-microgravity payloads, equipment for automatic electro-magnetic compatibility test station, design studies of gradient furnace for materials science experiments and solid state accelerometer for microgravity, replacement of general purpose computer at ESTEC, CLUSTER Phase-A study, SOHO Phase-A study, post delivery support for space telescope faint object camera, synchronised attitude and orbit control of satellites operating in clusters
Conditions of Access and Use
English, French
Textual